Projects have been made possible thanks to SSAF funding, operational funds, or a mixture of both.
See below our list of facility improvement projects for 2014 that are either completed or will be completed by years end:
Projects funded in part or in whole by SSAF funding:
- External Presentation Stage and Courtyard (Clayton)
- Club Lockers (x10) (Clayton)
- Key Locker System (Clayton)
- The Doug Ellis Pool Refurbishment (Clayton)
- Change Room Refurbishment (Caulfield)
- Lockers and Bike Repairs station to Velipod (Peninsula)
- Mobile Phone Chargebars (Peninsula)
- Light Towers to Oval 1 (Clayton)
- Green View Room (Clayton)
Operational funded improvements
- Lift Installation (Clayton)
- H&F Centre expansion - old cycle studio space (Clayton)
- Dedicated Cycle Studio (Clayton)
- New Multi Purpose Room (old common room, Clayton)
- Park Bench/Spectator Seating to Oval 1 (Clayton)
- Change Room Refurbishment (Clayton)
- Sports Court Resurfacing (Clayton)
- Equipment Upgrades (all 3 Fitness Centres)
Thanks to all the projects that went ahead in 2014, Monash Sport looks forward providing a further improves health and fitness environment in 2015.
![]() |
Our Outdoor Presentation Space |
![]() |
The Doug Ellis Swimming Pool |
![]() |
Female Change Rooms at Clayton |
Opening of the new lift in the Fitness Centre at Clayton |
No comments:
Post a Comment